国产女主播自拍视频精品,国产加勒比最新无码视频,国产黑丝白虎御姐被操,欧美成aⅴ人在线视频,久久av片免费高清,久久精品女人的天堂AV,久久久亚洲国码av,亚洲色一区二区三区四区,久青青视频在线观看久,亚洲欧美自拍偷偷玩

OA
CN

Danger elimination and reinforcement project of key (II) reservoir in Duchang County

Danger elimination and reinforcement project of key (II) res...
Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

The Renovation project from Binjiang hotel to Guantang secti...
The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

Small Hydropower station in Anhua County, Hunan Province

Small Hydropower station in Anhua County, Hunan Province
Small Hydropower station in Anhua County, Hunan Province.

High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

High standard farmland construction demonstration project of...
The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

Longtan Hydropower Station in Guangxi Province

Longtan Hydropower Station in Guangxi Province
As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
目前在第1頁(yè), 共有1頁(yè), 共有6條記錄 第一頁(yè) 上一頁(yè) 1 下一頁(yè) 最后一頁(yè) 跳轉(zhuǎn)到頁(yè)